Overview of R&D
Ongoing R&D activities known to DNV
•Overview of known R&D Projects
•Status on DNV Offshore Codes
•Plans for update of DNV-OS-F101
Slide 12002-01-25DNV Pipeline Committee Meeting January 2002
Overview of R&D Projects
Project0607
Hotpipe
Snamprogetti,
DNV
RP-F10X
Fracture Control
TWI, Sintef, DNV
RP-F108
Titanium Risers
DNV
RP-F201
Composite Risers
DNV
RP-F202
PRCI – RBI
PRCI, DNV
DWTT
DNV
System Pressure Test
APA, DNV
On-bottom Stability
Sintef, DNV
Installation Procedures
DNV
RP-F10X
Fracture Control – o. p/l
Sintef
Slide 22002-01-25DNV Pipeline Committee Meeting January 2002
DNV Pipeline Committee Meeting January 2002
2002-01-25
1
Overview of R&D
Overview of R&D Projects
System Pressure Test
s
60
s
e
n
k
50
c
i
h
t
Bursting
40
l
l
a
Collapse
W
30
System test
d
e
r
20Governing
i
u
q
e
10
R
0
04000
Water depth
Slide 32002-01-25DNV Pipeline Committee Meeting January 2002
Fracture control offshore pipelines
Objective:to develop a methodology for design against fracture
and plastic collapse, in particular in the post-yielding
range
Sponsors: Statoil, (Shell, Norsk Hydro, BP and Agip)
Project Management : Sintef
Motivation:New design opens for higher buckling capacity and the
limiting capacity will more often be the fracture
capacity.
Deliverables: Design methodology for design against fracture and
plastic collapse:
–Suitable for including calibrated partial safety factors
–Compatible with current design standards
–Compatible with other failure modes
The methodology will include the effect of biaxial
loadinging
Slide 42002-01-25DNV Pipeline Committee Meeting January 2002
DNV Pipeline Committee Meeting January 2002
2002-01-25
2
Overview of R&D
Overview of R&D Projects
Project0607
Europipe
High strength (X100)
Sour Service
Collapse
Corus
Collapse, UOE
Borealis
HP/HT pipelines
JPKenny UK
Intec
LC/DC
APA
Slide 52002-01-25DNV Pipeline Committee Meeting January 2002
DNV Offshore Codes
•Status
•New codes
•Update
Slide 62002-01-25DNV Pipeline Committee Meeting January 2002
DNV Pipeline Committee Meeting January 2002
2002-01-25
3
Overview of R&D
DNV Offshore Codes -
Status
•Online
–All is up an running except for some old RP’s
–Amendments and corrections
•Will be issued bi-annually (October/March)
•Will give an overview of all DNV Offshore Codes with
–Date of issue
–Date of Amendments and corrections
–Is downloadable and printable from internet FOC
–Will not be printed
•Amendments and corrections are incorportated in the online
versions (both in viewing and member area)
Slide 72002-01-25DNV Pipeline Committee Meeting January 2002
1
0
0
2
r
e
b
o
t
c
O
s
s
n
e
o
i
d
t
o
c
e
C
r
r
o
e
r
C
o
d
h
n
s
a
f
s
t
f
O
n
e
m
V
d
N
n
e
D
m
A
DNV Pipeline Committee Meeting January 2002
2002-01-25
4
Overview of R&D
DNV Offshore Codes -
CD Packages
(April -02)
1: “Classification of Drilling and Support Units”
Initial purchase price: NOK 6000, update service fee: NOK 2000
2: “Classification of Production and Storage Units”
Initial purchase price: NOK 6000, update service fee: NOK 2000
3: “Classification of Offshore Units” (1 and 2 combined)
Initial purchase price: NOK 7000 , update service fee: NOK 2000
4: “Pipeline Systems”
Initial purchase price: NOK 2000, update service fee: NOK 1000
5: “DNV Offshore Standards”
Initial purchase price: NOK 7000, update service fee: NOK 2000
6: “DNV Recommended Practices”
Initial purchase price: NOK 7000 , update service fee: NOK 2000
Slide 92002-01-25DNV Pipeline Committee Meeting January 2002
DNV Offshore Codes -
CD package; Pipeline Systems (
April -02)
Offshore Service Specifications
DNV-OSS-301 Certification and Verification of Pipelines
Offshore Standards
DNV-OS-F101 Submarine Pipeline Systems
DNV-OS-F201 Dynamic Risers
Recommended Practices
DNV-RP-B401 Cathodic Protection
DNV-RP-E305 On-Bottom Stability design of Submarine
Pipelines
DNV-RP-F101 Corroded Pipelines
DNV-RP-F104 Mechanical Pipeline Couplings
DNV-RP-F106 Factory Applied Pipeline Coatings for Corrosion
Control
DNV-RP-F107 Risk Assessment of Pipeline Protection
Slide 102002-01-25DNV Pipeline Committee Meeting January 2002
DNV Pipeline Committee Meeting January 2002
2002-01-25
5
Overview of R&D
DNV Offshore Codes -
New codes related to pipelines
DNV-RP-F201 Titanium risers2002Q3
DNV-RP-F108 Fracture Control for Reeling of
Pipelines2002Q3
DNV-RP-F202 Composite risers2002Q4
Slide 112002-01-25DNV Pipeline Committee Meeting January 2002
DNV Offshore Codes -
Plans for update of DNV-OS-F101
•To be issued in 2003
•Revision marks to denote changes
I.e. it is not anticipated to be a major update
appart from the layout of section 6
•No major changes are anticipated except for the
layout of section 6
•Industry initiatives are welcome!
Slide 122002-01-25DNV Pipeline Committee Meeting January 2002
DNV Pipeline Committee Meeting January 2002
2002-01-25
6
Overview of R&D
Ideas for update of DNV-OS-F101 (1)
•Overall
–Review the whole document in order to avoid "Shall"+ "Subject
to agreement" and replace this with "Should"
•3 Design premises and documentation
–Add requirement on Hydraulic analyses
–Streamline document requirements with OSS-301
–Functional requirements to pressure control system
•5 Design Criteria
–NDT level 1 when the plastic strain exceeds 0.3%
–Re-structure "material selection"
–Re-structure Fracture (when is F required?)
–Re-assess the use of α
A
–Express all pressures in Local incidental pressure
–Express the system collapse design check in terms of minimum
thickness instead of a factor 1.1
Slide 132002-01-25DNV Pipeline Committee Meeting January 2002
Ideas for update of DNV-OS-F101 (2)
•6Linepipe
–Restructure format (not content); Most specific
requirements shall be included in tables
–Continue to “Streamline” vs ISO
–Extend the Cr13 part with input from Statoil
including welding
–Clarify transverse, longitudinal in place of transverse
and longitudinal
–Interpretation of API equivalent testing methods
–Re-assess the dimensional requirements
–Re-assess the requirements for P
–Re-assess the "essential variables" for manufacture
Slide 142002-01-25DNV Pipeline Committee Meeting January 2002
DNV Pipeline Committee Meeting January 2002
2002-01-25
7
Overview of R&D
Ideas for update of DNV-OS-F101 (3)
SMYSYS
max
SMTS
YS(Rt0.5)
(MPa)(MPa)(MPa)
UTS(Rm)
(a
h
)
max
Orientation:T+LT+LT+LTLTL
Suppl Req.:
--P----SP
245365345370233
2960.900.920.93
362
43940.85
458
4856
0.920.940.95
555675655625527
Slide 152002-01-25DNV Pipeline Committee Meeting January 2002
Ideas for update of DNV-OS-F101 (4)
•7 Components and Assemblies
–Consider ISO standards on bends, flanges and
fittings
–Re-assess the requirements to hydrostatic testing.
This shall be consistent with he mill test
requirements, 6E1100 and the system pressure test,
9o500
•12 Commentary
–Add how to perform FE-calculations
–Discuss use of corrosion allowance versus down-
rating with time
–Extend cross reference table
Slide 162002-01-25DNV Pipeline Committee Meeting January 2002
DNV Pipeline Committee Meeting January 2002
2002-01-25
8
Overview of R&D
Ideas for update of DNV-OS-F101 (5)
•C Welding
–Adjustments and tailure made to welding procedures
•D NDT
–Adjustments in co-operation with pipe mills
•F On-shore section of offshore pipeline
–New appendix for on-shore part of offshore pipeline
system
Slide 172002-01-25DNV Pipeline Committee Meeting January 2002
Ideas on how to update of DNV-OS-F101
•What is the most effective way to incorporate
the industries experience?
–“Conference”
–Hearings
–Invitation
–Work groups
•Again, industry initiatives are welcome!
Slide 182002-01-25DNV Pipeline Committee Meeting January 2002
DNV Pipeline Committee Meeting January 2002
2002-01-25
9
Overview of R&D
Production Plant:
Drill Plant:Helideck:
OS-E201
OS-E201OS-E401
SEMI-SUB
FPSO
Risers:
Safety:
Safety:
OS-F201
OS-A101OS-A101
RP-F201
Materials:
Materials:
RP-F202
FSO
OS-B101
OS-B101
Safety:
Hull:
Hull:
OS-A101
OS-C101
OS-C101
Wire rope:
Materials:
OS-C103OS-C102
OS-E303
OS-B101
RP-C103
RP-C102
Hull:
OS-C-401
OS-C-401
Mooring:
Pipeline:
OS-C101
Stability:
Stability:
OS-E301
OS-F101
RP-F101
OS-C102
OS-C301
OS-C301
RP-C102
Marine/Machinery:
Marine/Machinery:
Chain:
RP-F104
OS-C-401
OS-D101
OS-D101
OS-E302
RP-F105
RP-F106
Stability:
Electrical:Electrical:
OS-C301
OS-D201
OS-D201
Anchors:
RP-F107
Marine/Machinery:
Instrumentation:
Instrumentation:
RP-E301
RP-F108
OS-D101
OS-D202
OS-D202
RP-E302
Electrical:
Fire Safety:
Fire Safety:
OS-D201
OS-D301 OS-D301
Instrumentation:
OS-D202
Fire Safety:
Wellheads:
OS-D301
OS-E101
DRILL PLANT
Certification/
PRODUCTION PLANT
Classification:
HELIDECK
Risk Based Verification:
OSS-101
Certification/
OSS-303
Classification:
OSS-101
OSS-102
DRILLING UNIT
FPSO
RISERS
Classification:
Classification:
Certification/
OSS-101OSS-102
Verification:
Class based on
OSS-302
FSO
Classification:
risk ass. :OSS-102
OSS-121LNG/LPG:
LNG/LPG:
WIRE ROPE
OSS-103
OSS-103
Certification:
MOORING
OSS-102PIPELINES:
Classification/
Certification/
Certification:
Verification:
OSS-101/102
OSS-301
ANCHORS
Certification/Verification
OSS-102
DNV Pipeline Committee Meeting January 2002
2002-01-25
10
发布评论